Consulta Contratos Visualizar Consulta Contrato.

Voltar para todos Consulta Contratos
Órgão 26242 - UNIVERSIDADE FEDERAL DE PERNAMBUCO
Unidade da Prestação do Serviço 153096 - PROGRAD
Unidade Gestora Origem do Contrato 153096 - PROGRAD
Unidades Descentralizadas
UASG Nome
Nenhum registro encontrado
Receita / Despesa Despesa
Número Contrato 00045/2025
Unidade Realizadora da Compra 158136 - IFPE-REITORIA
Número da Compra 00002/2023
Modalidade da Compra Pregão
Amparo Legal LEI 10.520 / 2002
Unidades Requisitantes
Tipo Contrato
Categoria Serviços
Subcategoria
Fornecedor 19.946.727/0001-94 - DORCAM LTDA
Processo 23076.036829/2025-16
Objeto CONTRATAÇÃO DE SERVIÇOS CONTINUADO DE LOCAÇÃO DEVEÍCULOS (ÔNIBUS, MICROÔNIBUS E VANS), COM MOTORISTA, E DEMAIS CUSTOS INCLUÍDOS, PARA VIAGENS DENTRO DO MUNICÍPIO, INTERMUNICIPAIS E INTERESTADUAIS, EM APOIO ÀS ATIVIDADES DIDÁTICO-PEDAGÓGICAS E ADMINISTRATIVAS UNIVERSIDADE FEDERAL DE PERNAMBUCO. A CONTRATAÇÃO DOS SERVIÇOS DE LOCAÇÃO DE VEÍCULOS TEM POR OBJETIVO PRINCIPAL VIABILIZAR A REALIZAÇÃO DAS AULAS DE CAMPO PARA OS TRÊS CAMPI DA UFPE (RECIFE, VITÓRIA E CARUARU), ALÉM DE EVENTOS CIENTÍFICOS, ESTUDANTIS E DEMANDAS DIVERSAS DA INSTITUIÇÃO, CONFORME CONDIÇÕES, QUANTIDADES E EXIGÊNCIAS ESTABELECIDAS NO TERMO DE REFERÊNCIA E SEUS ANEXOS.L.
Informações Complementares
Vig. Início 02/06/2025
Vig. Fim 02/06/2027
Situação Ativo
Valor Global R$ 3.967.011,36
Núm. Parcelas 1
Valor Parcela R$ 3.967.011,36
Valor Acumulado R$ 3.967.011,36
Total Despesas Acessórias R$ 0,00
Histórico
Data Assinatura Número Tipo Observação Data Início Data Fim Vlr. Global Parcelas Vlr. Parcela
30/05/2025 00045/2025 Contrato CELEBRAÇÃO DO CONTRATO: 00045/2025 DE ACORDO COM PROCESSO NÚMERO: 23076.036829/2025-16 02/06/2025 02/06/2026 3.478.814,22 1 3.478.814,22
02/06/2026 00001/2026 Termo Aditivo A) PRORROGAR A VIGÊNCIA DO CONTRATO Nº 45/2025 POR MAIS 12 (DOZE)MESES, EXPIRANDO-SE EM 02/06/2027, TENDO POR FUNDAMENTAL LEGAL A CLÁUSULA SEGUNDA DO REFERIDO CONTRATO;B) REAJUSTAR OS ITENS CONTRATADOS, NO PERÍODO DE 02/06/2025 A 27/07/2025, COM BASE NO ÍNDICE DE PREÇOS AO CONSUMIDOR AMPLO – IPCA/IBGE, NO PERCENTUAL DE 4,10%, REFERENTE AO PERÍODO DE JULHO/2023 A JUNHO/2024 (1º REAJUSTE); E A PARTIR DE 28/07/2025, COM BASE NO ÍNDICE DE PREÇO AO CONSUMIDOR AMPLO – IPCA/IBGE, NO PERCENTUAL DE 4,95%, REFERENTE AO PERÍODO DE JULHO/2024 A JUNHO/2025 (2º REAJUSTE). 02/06/2026 02/06/2027 3.800.844,63 1 3.800.844,63
06/10/2026 00003/2026 Termo de Apostilamento REAJUSTAMENTO DO VALOR CONTRATADO, DE ACORDO COM O PERCENTUAL ACUMULADO DO IPCA (ÍNDICE NACIONAL DE PREÇOS AO CONSUMIDOR AMPLO) DOS ÚLTIMOS 12 MESES (JULHO/2025 A JUNHO/2026), O QUE REPRESENTA UM REAJUSTE DE 4,3700%. 02/06/2025 02/06/2027 3.967.011,36 1 3.967.011,36
Despesas Acessórias
Descrição Vencimento Valor
Empenhos
UG Número PI ND Emp. A liq. Liquid. Pg RP Inscr. RP A Liq. RP Liq. RP Pg
153096 2025NE000027 M0045G0125N - CONTRATO DB 045/2025 - PE N¨02/2023 339033 - PASSAGENS E DESPESAS COM LOCOMOCAO 598.416,76 0,00 0,00 598.416,76 0,00 0,00 0,00 0,00
153096 2025NE000045 M0045G0125N - CONTRATO DB 045/2025 - PE N¨02/2023 339033 - PASSAGENS E DESPESAS COM LOCOMOCAO 591.810,70 0,00 54.023,75 537.786,95 0,00 0,00 0,00 54.023,75
153096 2025NE000046 M0045G0125N - CONTRATO DB 045/2025 - PE N¨02/2023 339033 - PASSAGENS E DESPESAS COM LOCOMOCAO 6.441,00 0,00 0,00 6.441,00 0,00 0,00 0,00 0,00
153096 2026NE000008 M0045G0125N - CONTRATO DB 045/2025 - PE N¨02/2023 339033 - PASSAGENS E DESPESAS COM LOCOMOCAO 71.890,00 0,00 0,00 71.890,00 0,00 0,00 0,00 0,00
153096 2026NE000022 M0045G0125N - CONTRATO DB 045/2025 - PE N¨02/2023 339033 - PASSAGENS E DESPESAS COM LOCOMOCAO 1.607.184,70 345.951,78 123.864,90 1.137.368,02 0,00 0,00 0,00 0,00
Faturas
Número Data Emissão Processo Data Ateste Valor
379 2026-07-02 23076.046611/2026-30 2026-07-13 24605.91
375 2026-07-02 23076.046120/2026-95 2026-07-13 4932.14
376 2026-07-02 23076.046120/2026-95 2026-07-13 2730.23
391 2026-07-02 23076.046611/2026-30 2026-07-13 2730.23
377 2026-07-02 23076.046120/2026-95 2026-07-13 2261.08
378 2026-07-02 23076.046120/2026-95 2026-07-13 2611.15
380 2026-07-02 23076.046120/2026-95 2026-07-13 11483.46
381 2026-07-02 23076.046120/2026-95 2026-07-13 14047.42
400 2026-07-03 23076.046611/2026-30 2026-07-13 8190.69
382 2026-07-02 23076.046120/2026-95 2026-07-13 2730.23
383 2026-07-02 23076.046120/2026-95 2026-07-13 15666.90
401 2026-07-06 23076.046611/2026-30 2026-07-13 8190.69
384 2026-07-02 23076.046120/2026-95 2026-07-13 2730.23
402 2026-07-06 23076.046611/2026-30 2026-07-13 8190.69
385 2026-07-02 23076.046120/2026-95 2026-07-13 2611.15
403 2026-07-06 23076.046611/2026-30 2026-07-13 8190.69
386 2026-07-02 23076.046120/2026-95 2026-07-13 24356.32
404 2026-07-06 23076.046611/2026-30 2026-07-13 8190.69
405 2026-07-06 23076.046611/2026-30 2026-07-13 2730.23
387 2026-07-02 23076.046120/2026-95 2026-07-13 13941.14
388 2026-07-02 23076.046120/2026-95 2026-07-13 14444.51
406 2026-07-06 23076.046611/2026-30 2026-07-13 43292.33
407 2026-07-06 23076.046611/2026-30 2026-07-13 5460.46
408 2026-07-06 23076.046611/2026-30 2026-07-13 10223.45
389 2026-07-02 23076.046120/2026-95 2026-07-13 26049.05
409 2026-07-06 23076.046611/2026-30 2026-07-13 15918.92
390 2026-07-02 23076.046120/2026-95 2026-07-13 9903.70
392 2026-07-03 23076.046120/2026-95 2026-07-13 2730.23
393 2026-07-03 23076.046120/2026-95 2026-07-13 2730.23
394 2026-07-03 23076.046120/2026-95 2026-07-13 3833.98
395 2026-07-03 23076.046120/2026-95 2026-07-13 2390.00
396 2026-07-03 23076.046120/2026-95 2026-07-13 7100.30
397 2026-07-03 23076.046120/2026-95 2026-07-13 9567.61
398 2026-07-03 23076.046120/2026-95 2026-07-13 24572.07
399 2026-07-03 23076.046120/2026-95 2026-07-13 8190.69
416 2026-08-04 23076056663/2026-32 2026-08-17 3758.39
412 2026-08-04 23076.056663/2026-32 2026-08-17 2611.15
413 2026-08-04 23076.056663/2026-32 2026-08-17 9374.05
415 2026-08-04 23076.056663/2026-32 2026-08-17 58470.04
414 2026-08-04 23076.056663/2026-32 2026-08-17 16381.38
428 2026-09-01 23076.067577/2026-40 2026-09-10 15221.60
434 2026-10-01 23076.079453/2026-70 2026-10-05 2611.15
435 2026-10-01 23076.079453/2026-70 2026-10-05 3812.93
436 2026-10-01 23076.079453/2026-70 2026-10-05 2730.23
437 2026-10-01 23076.079453/2026-70 2026-10-05 2611.15
438 2026-10-01 23076.079453/2026-70 2026-10-05 3812.93
439 2026-10-01 23076.079453/2026-70 2026-10-05 2730.23
440 2026-10-01 23076.079453/2026-70 2026-10-05 3932.01
441 2026-10-01 23076.079453/2026-70 2026-10-05 2730.23
442 2026-10-01 23076.079453/2026-70 2026-10-05 2730.23
443 2026-10-01 23076.079453/2026-70 2026-10-05 2611.15
444 2026-10-01 23076.079453/2026-70 2026-10-05 3932.01
445 2026-10-01 23076.079453/2026-70 2026-10-05 1201.78
446 2026-10-01 23076.079453/2026-70 2026-10-05 18414.81
448 2026-10-01 23076.079453/2026-70 2026-10-05 2730.23
2600000000691 2026-10-01 23076.079453/2026-70 2026-10-05 2730.23
433 2026-10-01 23076.079453/2026-70 2026-10-05 2611.15
87 2025-07-04 23076.058257/2025-65 2025-07-11 2390.00
88 2025-07-04 23076.058257/2025-65 2025-07-11 7170.00
89 2025-07-04 23076.058257/2025-65 2025-07-11 7497.00
90 2025-07-04 23076.058257/2025-65 2025-07-11 2390.00
86 2025-07-04 23076.058257/2025-65 2025-07-11 1100.00
DACTE Nº 62 2025-07-03 23076.059292/2025-56 2025-07-15 7170.00
264 2026-04-06 23076.024280/2026-15 2026-04-08 2499.00
266 2026-04-06 23076.024280/2026-15 2026-04-08 9574.98
200 2025-12-01 23076.105250/2025-14 2025-12-18 8594.60
203 2025-12-01 23076.105250/2025-14 2025-12-18 10797.00
227 2025-12-15 23076.105250/2025-14 2025-12-18 999.60
222 2025-12-15 23076.105250/2025-14 2025-12-18 12376.93
217 2025-12-05 23076.105250/2025-14 2025-12-18 8983.90
223 2025-12-15 23076.105250/2025-14 2025-12-18 9560.00
224 2025-12-15 23076.105250/2025-14 2025-12-18 1100.00
225 2025-12-15 23076.105250/2025-14 2025-12-18 13298.60
229 2025-12-15 23076.105250/2025-14 2025-12-18 15611.40
DACTE 35 E VARIOS 2025-07-02 23076.056931/2025-74 2025-07-08 136585.40
232 2025-12-15 23076.105250/2025-14 2025-12-18 24421.60
231 2025-12-15 23076.105250/2025-14 2025-12-18 2499.00
234 2025-12-15 23076.105250/2025-14 2025-12-18 7497.00
235 2025-12-15 23076.105250/2025-14 2025-12-18 1100.00
80 2025-07-04 23076.058257/2025-65 2025-07-11 7170.00
4009 2025-11-05 23076.095051/2025-04 2025-11-06 2390.00
4010 2025-11-05 23076.095051/2025-04 2025-11-06 2499.00
168 2025-11-03 23076.095051/2025-04 2025-11-06 2499.00
178 2025-11-04 23076.095051/2025-04 2025-11-06 2390.00
179 2025-11-04 23076.095051/2025-04 2025-11-06 3971.30
176 2025-11-04 23076.095051/2025-04 2025-11-06 2499.00
171 2025-11-04 23076.095051/2025-04 2025-11-06 2499.00
174 2025-11-04 23076.095051/2025-04 2025-11-06 3490.00
173 2025-11-04 23076.095051/2025-04 2025-11-06 2390.00
169 2025-11-04 23076.095051/2025-04 2025-11-06 2390.00
172 2025-11-04 23076.095051/2025-04 2025-11-06 2499.00
70 2025-07-03 23076.058257/2025-65 2025-07-11 2390.00
71 2025-07-03 23076.058257/2025-65 2025-07-11 7170.00
72 2025-07-03 23076.058257/2025-65 2025-07-11 2390.00
73 2025-07-04 23076.058257/2025-65 2025-07-11 2499.00
DACTE Nº 39 2025-07-03 23076.059292/2025-56 2025-07-15 2499.00
DACTE Nº 40 2025-07-03 23076.059292/2025-56 2025-07-15 2499.00
DACTE Nº 43 2025-07-03 23076.059292/2025-56 2025-07-15 2499.00
DACTE Nº 44 2025-07-03 23076.059292/2025-56 2025-07-15 2390.00
81 2025-07-04 23076.058257/2025-65 2025-07-11 3490.00
DACTE Nº 57 2025-07-03 23076.059292/2025-56 2025-07-15 1100.00
82 2025-07-04 23076.058257/2025-65 2025-07-11 7497.00
83 2025-07-04 23076.058257/2025-65 2025-07-11 1100.00
DACTE Nº 59 2025-07-03 23076.059292/2025-56 2025-07-15 2390.00
84 2025-07-04 23076.058257/2025-65 2025-07-11 1100.00
85 2025-07-04 23076.058257/2025-65 2025-07-11 1100.00
91 2025-07-04 23076.058257/2025-65 2025-07-11 2499.00
92 2025-07-04 23076.058257/2025-65 2025-07-11 2390.00
DACTE Nº 96 2025-07-10 23076.059292/2025-56 2025-07-15 9996.00
93 2025-07-04 23076.058257/2025-65 2025-07-11 3300.00
76 2025-07-04 23076.058257/2025-65 2025-07-11 1100.00
3618 2025-07-01 23076.058257/2025-65 2025-07-11 2499.00
DACTE Nº 97 2025-07-10 23076.059292/2025-56 2025-07-15 2390.00
3619 2025-07-01 23076.058257/2025-65 2025-07-11 3490.00
3620 2025-07-01 23076.058257/2025-65 2025-07-11 2390.00
3631 2025-07-03 23076.058257/2025-65 2025-07-11 440.00
3632 2025-03-07 23076.058257/2025-65 2025-07-11 2390.00
3633 2025-07-03 23076.058257/2025-65 2025-07-11 2390.00
DACTE Nº 98 2025-07-10 23076.059292/2025-56 2025-07-15 11950.00
3634 2025-07-04 23076.058257/2025-65 2025-07-11 2499.00
48 2025-07-03 23076.058257/2025-65 2025-07-11 4054.60
69 2025-07-03 23076.058257/2025-65 2025-07-11 6790.00
74 2025-07-04 23076.058257/2025-65 2025-07-11 1100.00
75 2025-07-04 23076.058257/2025-65 2025-07-11 2499.00
77 2025-07-04 23076.058257/2025-65 2025-07-11 7170.00
78 2025-07-04 23076.058257/2025-65 2025-07-11 5066.60
79 2025-07-04 23076.058257/2025-65 2025-07-11 7497.00
DACTE Nº 99 2025-07-10 23076.059292/2025-56 2025-07-15 2830.00
DACTE Nº 100 2025-07-10 23076.059292/2025-56 2025-07-15 3599.00
DACTE Nº 101 2025-07-10 23076.059292/2025-56 2025-07-15 4664.80
DACTE Nº 102 2025-07-10 23076.059292/2025-56 2025-07-15 2499.00
DACTE Nº 103 2025-07-10 23076.059292/2025-56 2025-07-15 1575.30
3639 2025-07-04 23076.059292/2025-56 2025-07-15 2390.00
3640 2025-07-04 23076.059292/2025-56 2025-07-15 2499.00
106 2025-08-01 23076.066613/2025-75 2025-08-14 14513.60
107 2025-08-01 23076.066613/2025-75 2025-08-14 7497.00
108 2025-08-01 23076.066613/2025-75 2025-08-14 16863.44
110 2025-08-01 23076.066613/2025-75 2025-08-14 21138.60
111 2025-08-01 23076.066613/2025-75 2025-08-14 10956.40
113 2025-08-01 23076.066613/2025-75 2025-08-14 2390.00
141 2025-08-08 23076.066613/2025-75 2025-08-14 109.00
114 2025-08-01 23076.066613/2025-75 2025-08-14 7170.00
115 2025-08-01 23076.066613/2025-75 2025-08-14 7497.00
116 2025-08-01 23076.066613/2025-75 2025-08-14 7170.00
118 2025-08-04 23076.066613/2025-75 2025-08-14 9996.00
120 2025-08-04 23076.066613/2025-75 2025-08-14 11348.40
121 2025-08-04 23076.066613/2025-75 2025-08-14 7497.00
122 2025-08-04 23076.066613/2025-75 2025-08-14 7497.00
123 2025-08-04 23076.066613/2025-75 2025-08-14 2499.00
124 2025-08-04 23076.066613/2025-75 2025-08-14 2499.00
125 2025-08-04 23076.066613/2025-75 2025-08-14 2390.00
126 2025-08-04 23076.066613/2025-75 2025-08-14 2499.00
127 2025-08-04 23076.066613/2025-75 2025-08-14 6896.50
128 2025-08-04 23076.036829/2025-16 2025-08-14 2390.00
129 2025-08-04 23076.066613/2025-75 2025-08-14 2499.00
130 2025-08-04 23076.066613/2025-75 2025-08-14 2390.00
131 2025-08-04 23076.066613/2025-75 2025-08-14 2499.00
132 2025-08-04 23076.066613/2025-75 2025-08-14 10221.40
133 2025-08-04 23076.066613/2025-75 2025-08-14 3248.60
134 2025-08-04 23076.066613/2025-75 2025-08-14 2966.90
135 2025-08-04 23076.066613/2025-75 2025-08-14 8084.85
136 2025-08-05 23076.066613/2025-75 2025-08-14 14896.00
137 2025-08-05 23076.066613/2025-75 2025-08-14 12585.27
138 2025-08-07 23076.066613/2025-75 2025-08-14 7497.00
3668 2025-08-01 23076.066613/2025-75 2025-08-14 2390.00
3675 2025-08-04 23076.066613/2025-75 2025-08-14 4889.00
112 2025-08-01 23076.066613/2025-75 2025-08-14 2390.00
105 2025-08-01 23076.066613/2025-75 2025-08-13 2390.00
270 2026-05-06 23076.034424/2026-55 2026-05-20 3490.00
274 2026-05-07 23076.034424/2026-55 2026-05-20 1396.00
271 2026-05-06 23076.034424/2026-55 2026-05-20 2390.00
307 2026-05-08 23076.034424/2026-55 2026-05-20 2499.00
273 2026-05-07 23076.034424/2026-55 2026-05-20 12779.20
290 2026-05-08 23076.034424/2026-55 2026-05-20 2499.00
272 2026-05-06 23076.034424/2026-55 2026-05-20 7188.57
276 2026-05-07 23076.034424/2026-55 2026-05-20 3490.00
275 2026-05-07 23076.034424/2026-55 2026-05-20 4889.00
279 2026-05-07 23076.034424/2026-55 2026-05-20 1100.00
287 2026-05-07 23076.034424/2026-55 2026-05-20 4044.80
153 2025-09-03 23076.076899/2025-64 2025-09-15 8606.60
149 2025-09-03 23076.076899/2025-64 2025-09-15 13440.51
152 2025-09-03 23076.076899/2025-64 2025-09-15 2390.00
2600000000229 2026-05-07 23076.034424/2026-55 2026-05-20 4889.00
282 2026-05-07 23076.034424/2026-55 2026-05-20 3490.00
150 2025-09-03 23076.076899/2025-64 2025-09-15 2390.00
151 2025-09-03 23076.076899/2025-64 2025-09-15 2499.00
145 2025-09-03 23076.076899/2025-64 2025-09-15 2390.00
2600000000231 2026-05-07 23076.034424/2026-55 2026-05-20 4889.00
289 2026-05-08 23076.034424/2026-55 2026-05-20 2390.00
2600000000233 2026-05-08 23076.034424/2026-55 2026-05-20 4780.00
148 2025-09-03 23076.076899/2025-64 2025-09-15 4030.10
146 2025-09-03 23076.076899/2025-64 2025-09-15 13256.80
158 2025-10-01 23076.085315/2025-06 2025-10-13 2390.00
160 2025-10-02 23076.085315/2025-06 2025-10-13 2390.00
162 2025-10-02 23076.085315/2025-06 2025-10-13 6441.00
161 2025-10-02 23076.085315/2025-06 2025-10-13 2390.00
159 2025-10-02 23076.085315/2025-06 2025-10-13 2499.00
11/2025 2025-12-01 23076.103359/2025-49 2025-12-09 147233.71
177 2025-11-04 23076.095051/2025-04 2025-11-06 2499.00
240 2025-12-16 23076.105525/2025-58 2025-12-17 16709.00
242 2025-12-16 23076.105525/2025-58 2025-12-17 2499.00
244 2025-12-16 23076.105525/2025-58 2025-12-17 4802.00
245 2025-12-16 23076.105525/2025-58 2025-12-16 3476.50
246 2025-12-16 23076.105525/2025-58 2025-12-17 1100.00
241 2025-12-16 23076.105525/2025-58 2025-12-17 2499.00
247 2025-12-16 23076.105525/2025-58 2025-12-17 2499.00
248 2025-12-16 23076.105525/2025-58 2025-12-17 4487.20
249 2025-12-16 23076.105525/2025-58 2025-12-17 3378.50
250 2025-12-16 23076.105525/2025-58 2025-12-17 1100.00
167 2025-11-03 23076.095051/2025-04 2025-11-06 2499.00
251 2025-12-16 23076.105525/2025-58 2025-12-17 3941.90
180 2025-11-04 23076.095051/2025-04 2025-11-06 16885.20
166 2025-11-03 23076.095051/2025-04 2025-11-06 2499.00
170 2025-11-04 23076.095051/2025-04 2025-11-06 3490.00
165 2025-11-03 23076.095051/2025-04 2025-11-06 2499.00
175 2025-11-04 23076.095051/2025-04 2025-11-06 2390.00
4129 2025-12-15 23076.105250/2025-14 2025-12-18 2499.00
221 2025-12-05 23076.105250/2025-14 2025-12-18 7497.00
216 2025-12-05 23076.105250/2025-14 2025-12-18 12495.00
228 2025-12-15 23076.105250/2025-14 2025-12-18 18264.76
218 2025-12-05 23076.105250/2025-14 2025-12-18 7497.00
226 2025-12-15 23076.105250/2025-14 2025-12-18 44392.64
219 2025-12-05 23076.105250/2025-14 2025-12-18 1100.00
220 2025-12-05 23076.105250/2025-14 2025-12-18 2499.00
233 2025-12-15 23076.105250/2025-14 2025-12-18 7497.00
237 2025-12-15 23076.105250/2025-14 2025-12-18 7497.00
230 2025-12-15 23076.105250/2025-14 2025-12-18 2499.00
238 2025-12-15 23076.105250/2025-14 2025-12-18 2499.00
236 2025-12-15 23076.105250/2025-14 2025-12-18 2390.00
239 2025-12-15 23076.105250/2025-14 2025-12-18 16140.60
255 2025-12-19 23076.106993/2025-95 2025-12-22 9560.00
254 2025-12-19 23076.106993/2025-95 2025-12-22 9560.00
252 2025-12-19 23076.106993/2025-95 2025-12-22 10715.00
253 2025-12-19 23076.106993/2025-95 2025-12-22 14638.91
256 2025-12-22 23076.106993/2025-95 2025-12-22 32164.94
298 2026-05-08 23076.034561/2026-42 2026-05-15 21080.31
280 2026-05-07 23076.03456/2026-42 2026-05-15 2390.00
284 2026-05-07 23076.034561/2026-42 2026-05-15 4889.00
283 2026-05-07 23076.036829/2025-16 2026-05-15 1100.00
288 2026-05-07 23076.034561/2026-42 2026-05-15 2499.00
295 2026-05-08 23076.034561/2026-42 2026-05-15 6043.90
291 2026-05-08 23076.034561/2026-42 2026-05-15 3234.00
292 2026-05-08 23076.034561/2026-42 2026-05-15 2499.00
294 2026-05-08 23076.034561/2026-42 2026-05-15 2499.00
301 2026-05-08 23076.034561/2026-42 2026-05-15 2499.00
303 2026-05-08 23076.034561/2026-42 2026-05-15 2499.00
304 2026-05-08 23076.034561/2026-42 2026-05-15 1100.00
302 2026-05-08 23076.034561/2026-42 2026-05-15 2390.00
305 2026-05-08 23076.034561/2026-42 2026-05-15 7497.00
300 2026-05-08 23076.034561/2026-42 2026-05-15 1100.00
311 2026-05-08 23076.034561/2026-42 2026-05-15 2499.00
310 2026-05-08 23076.034561/2026-42 2026-05-15 3373.60
309 2026-05-08 23076.034561/2026-42 2026-05-15 1100.00
308 2026-05-08 23076.034561/2026-42 2026-05-15 4015.33
296 2026-05-08 23076.034561/2026-42 2026-05-15 1100.00
299 2026-05-08 23076.034561/2026-42 2026-05-15 7170.00
297 2026-05-08 23076.034561/2026-42 2026-05-15 2499.00
293 2026-05-08 23076.034561/2026-42 2026-05-15 6928.60
260 2026-03-02 23076.018211/2026-45 2026-03-12 4889.00
265 2026-04-06 23076.024280/2026-15 2026-04-08 2499.00
263 2026-04-06 23076.024280/2026-15 2026-04-08 2499.00
281 2026-05-07 23076.034424/2026-55 2026-05-20 4780.00
312 2026-05-08 23076.034424/2026-55 2026-05-20 113209.60
277 2026-05-07 23076.034424/2026-55 2026-05-20 2499.00
2600000000232 2026-05-07 23076.034424/2026-55 2026-05-20 3599.00
269 2026-05-06 23076.034424/2026-55 2026-05-20 3490.00
324 2026-06-03 23076.042424/2026-74 2026-06-22 10724.80
2600000000230 2026-05-07 23076.034424/2026-55 2026-05-20 2499.00
268 2026-05-06 23076.034424/2026-55 2026-05-20 1100.00
285 2026-05-07 23076.034424/2026-55 2026-05-20 2499.00
350 2026-06-09 23076.042424/2026-74 2026-06-22 2499.00
315 2026-06-02 23076.042418/2026-42 2026-06-19 15380.42
314 2026-06-02 23076.042418/2026-42 2026-06-19 18848.29
316 2026-06-02 23076.042418/2026-42 2026-06-19 8790.60
352 2026-06-09 23076.042418/2026-42 2026-06-19 7117.00
366 2026-06-09 23076.042418/2026-42 2026-06-19 6627.00
317 2026-06-02 23076.042418/2026-42 2026-06-19 4780.00
2600000000286 2026-06-02 23076.042418/2026-42 2026-06-19 2390.00
356 2026-06-09 23076.042418/2026-42 2026-06-20 2499.00
371 2026-06-09 23076.042418/2026-42 2026-06-20 10797.00
353 2026-06-09 23076.042418/2026-42 2026-06-20 2390.00
327 2026-06-03 23076.042418/2026-42 2026-06-20 3077.20
355 2026-06-09 23076.042418/2026-42 2026-06-20 2390.00
354 2026-06-09 23076.042418/2026-42 2026-06-20 2499.00
326 2026-06-03 23076.042418/2026-42 2026-06-20 7497.00
325 2026-06-03 23076.042418/2026-42 2026-06-20 7497.00
362 2026-06-09 23076.042418/2026-42 2026-06-20 1100.00
286 2026-05-07 23076.034561/2026-42 2026-05-15 2499.00
370 2026-06-09 23076.042418/2026-42 2026-06-20 6786.30
319 2026-06-02 23076.042418/2026-42 2026-06-20 1100.00
323 2026-06-02 23076.042418/2026-42 2026-06-20 7170.00
306 2026-05-08 23076.034424/2026-55 2026-05-20 440.00
318 2026-06-02 23076.042424/2026-74 2026-06-22 2499.00
348 2026-06-09 23076.042424/2026-74 2026-06-22 3782.80
349 2026-06-09 23076.042424/2026-74 2026-06-22 1100.00
374 2026-06-09 23076.042424/2026-74 2026-06-22 3490.00
347 2026-06-08 23076.042424/2026-74 2026-06-22 4998.00
346 2026-06-08 23076.042424/2026-74 2026-06-22 1100.00
330 2026-06-08 23076.042424/2026-74 2026-06-22 21324.30
334 2026-06-08 23076.042424/2026-74 2026-06-22 35981.37
340 2026-06-08 23076.042424/2026-74 2026-06-22 17444.00
337 2026-06-08 23076.042424/2026-74 2026-06-22 1100.00
320 2026-06-02 23076.042418/2026-42 2026-06-20 7170.00
342 2026-06-08 23076.042424/2026-74 2026-06-22 25293.80
339 2026-06-08 23076.042424/2026-74 2026-06-22 8574.80
333 2026-06-08 23076.042424/2026-74 2026-06-22 4880.20
329 2026-06-03 23076.042424/2026-74 2026-06-22 2499.00
365 2026-06-09 23076.042424/2026-74 2026-06-22 1100.00
345 2026-06-08 23076.042424/2026-74 2026-06-22 7497.00
2600000000299 2026-06-09 23076.042424/2026-74 2026-06-22 2499.00
344 2026-06-08 23076.042424/2026-74 2026-06-22 2499.00
332 2026-06-08 23076.042424/2026-74 2026-06-22 14994.00
341 2026-06-08 23076.042424/2026-74 2026-06-22 7170.00
2600000000301 2026-06-09 23076.042424/2026-74 2026-06-22 1100.00
343 2026-06-08 23076.042424/2026-74 2026-06-22 2499.00
358 2026-06-09 23076.042418/2026-42 2026-06-20 2499.00
363 2026-06-09 23076.042418/2026-42 2026-06-20 2499.00
372 2026-06-09 23076.042418/2026-42 2026-06-20 2390.00
360 2026-06-09 23076.042418/2026-42 2026-06-20 2499.00
367 2026-06-09 23076.042418/2026-42 2026-06-20 2499.00
359 2026-06-09 23076.042418/2026-42 2026-06-20 10797.00
361 2026-06-09 23076.042418/2026-42 2026-06-20 16339.14
368 2026-06-09 23076.042418/2026-42 2026-06-20 2390.00
369 2026-06-09 23076.042418/2026-42 2026-06-20 14734.10
357 2026-06-09 23076.042418/2026-42 2026-06-20 2390.00
373 2026-06-09 23076.042418/2026-42 2026-06-20 440.00
364 2026-06-09 23076.042418/2026-42 2026-06-20 2056.00
338 2026-06-08 23076.042424/2026-74 2026-06-22 2643.50
336 2026-06-08 23076.042424/2026-74 2026-06-22 4770.10
335 2026-06-08 23076.042424/2026-74 2026-06-22 2499.00
322 2026-06-02 23076.042424/2026-74 2026-06-22 10470.00
331 2026-06-08 23076.042424/2026-74 2026-06-22 12495.00
321 2026-06-02 23076.042424/2026-74 2026-06-22 9996.00
351 2026-06-09 23076.042424/2026-74 2026-06-22 7170.00
2600000000287 2026-06-03 23076.042424/2026-74 2026-06-22 2499.00
328 2026-06-03 23076.042424/2026-74 2026-06-22 2499.00
Garantias
Tipo Vencimento Valor
Itens
Tipo Item Quantidade Valor Unitário Valor Total
Serviço LOCAÇÃO DE VEÍCULOS - LEVES / PESADOS / COM MOTORISTA 11808 8.54 100840.3200
Serviço LOCAÇÃO DE VEÍCULOS - LEVES / PESADOS / COM MOTORISTA 39957 5.58 222960.0600
Serviço LOCAÇÃO DE VEÍCULOS - LEVES / PESADOS / COM MOTORISTA 467 1254.3 585758.1000
Serviço LOCAÇÃO DE VEÍCULOS - LEVES / PESADOS / COM MOTORISTA 339 2725.26 923863.1400
Serviço LOCAÇÃO DE VEÍCULOS - LEVES / PESADOS / COM MOTORISTA 371 2849.54 1057179.3400
Serviço LOCAÇÃO DE VEÍCULOS - LEVES / PESADOS / COM MOTORISTA 96280 11.18 1076410.4000
Prepostos
CPF Nome
Responsáveis
CPF Nome Tipo
***.473.404-** JOÃO GABRIEL TEIXEIRA DE FIGUEIREDO Gestor
***.655.634-** THIAGO ANDRADE MENDONÇA DE OLIVEIRA Gestor Substituto
***.646.054-** ISABELA ANDRADE DE LIMA MORAIS Fiscal Técnico
***.413.872-** SYLÉCIA KÉLCIA SARAIVA DE ALENCAR Fiscal Técnico Substituto
Instrumentos de Cobrança Clique aqui para acessar
Terceirizados Clique aqui para acessar
Arquivos
Tipo Nome Tamanho Criado
3º TERMO DE APOSTILA 346.44 KB 08/10/2026 16:06:20
CONTRATO Nº 45.2025 1.44 MB 03/07/2025 10:16:26
Decreto 11.430 Não
Contrata mais brasil
Numero contratacao
Mao obra exclusiva
Percentual reserva vagas 0
Total postos contrato decreto 0
Total vagas reservadas 0
Codigo unidade pncp externo